MB · Solar

Solar quotes in Morden, MB.

One real quote from a vetted local Morden installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Morden installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
8 kW
Average system size
$3.00/W
Average cost (CAD)
14 yrs
Average payback
20+
Local installers

Why solar in Morden

The most important thing to understand about solar in Morden is a piece of terminology. Manitoba Hydro does not run net metering, it runs net billing, and the difference decides how you should size a system. Under net metering, a kilowatt hour you export is banked and later drawn back at the same value as a kilowatt hour you buy. Under Manitoba Hydro's net billing, exported energy is bought from you at a stated price per kilowatt hour, currently 7.173 cents, while the energy you buy back is charged at the residential rate of 9.970 cents. Those are different numbers, and every design decision on a Morden roof follows from that gap. NRCan puts local photovoltaic potential at 1,314 kWh per installed kW per year.

What we install on in Morden

Morden's housing stock, briefly.

Morden's housing stock is two-thirds single-detached houses (66.8% of 3,995 dwellings), with the rest split between low-rise apartments (11.6%), row housing (8.4%), semi-detached (5.9%), duplexes (0.9%) and a small high-rise share (1.1%). Most homes here have an independent roof available for a solar array, while roughly a fifth of households live in a low-rise, row or semi-detached building where a rooftop decision depends on a landlord or shared wall.

Source: www150.statcan.gc.ca

  • Two-thirds of homes (66.8%) are single-detached with an independent roof.
  • Low-rise apartments are 11.6% of dwellings, where tenants need landlord sign-off for solar.
  • Row housing (8.4%) and semi-detached/duplex units (6.8% combined) share a roofline with a neighbour.
  • High-rise buildings are a small share of the stock at 1.1%.

Source: www150.statcan.gc.ca

HOA reality: Morden has no HOAs. Instead the City has individually designated specific historic properties, such as 577 Stephen Street and Maple Leaf School (designated a Municipal Heritage Site in 1988), on its own heritage register. Most homes carry no such designation and are unrestricted; only the specifically listed addresses face heritage constraints on exterior changes.
Source: morden.ca
Your utility

How Manitoba Hydro treats solar.

Manitoba Hydro is the sole electricity distributor here, and residential rates are a flat energy charge (9.970 cents/kWh) plus a $9.84 monthly basic charge, not time-of-use. The utility's old Solar Energy Program rebate closed in 2018; a homeowner installing solar today instead applies for net billing, which pays a per-kWh credit for excess generation (currently 7.173 cents/kWh through March 31, 2027) rather than banking energy credits like net metering. Getting connected requires a signed Excess Energy Purchase Agreement and Interconnection Request plus a bi-directional meter.

Source: hydro.mb.ca

Permits in Morden

Morden requires a building permit for new construction, additions, attached garages, detached accessory buildings, decks above grade, basement development and similar work, and for any building over 10 sq m. Replacing shingles, siding, doors or windows with the same material needs no permit; the city's list does not name solar arrays either way. Electrical hookup is handled separately through Manitoba Hydro, and starting work without an approved permit doubles the fee.

Source: morden.ca

Net billing, not net metering, and why it changes sizing

Manitoba Hydro is the sole electricity distributor in Morden, and its programme for customer generation is net billing. In plain terms: the electricity your panels produce and your house uses at the same moment never touches the meter, so it displaces power you would have bought at the residential energy charge of 9.970 cents per kWh. The electricity your panels produce and your house does not use flows out to the grid and Manitoba Hydro pays you the excess energy price for it, currently $0.07173 per kWh, or 7.173 cents.

That gap is the whole design problem. A kilowatt hour consumed inside the house is worth more to you than the same kilowatt hour sold, so the value of an array depends heavily on how much of its output your household actually uses as it is generated rather than on how much it generates in total. Two houses with identical systems and identical annual production can end up in noticeably different positions if one runs its heavy loads during daylight and the other does not.

The practical consequences are ordinary but real. Sizing to cover your annual consumption on paper is not the same as sizing for value, because the surplus half of the year is paid at the lower price. Running the dishwasher, laundry and any electric vehicle charging during the day moves kilowatt hours from the export column to the self-consumption column at no cost. And an installer's proposal should show self-consumption and export separately, because a single annual production figure hides the number that matters.

What Manitoba Hydro charges, and what solar does not offset

Manitoba Hydro's residential rate in Morden is a flat energy charge of 9.970 cents per kWh. It is not time-of-use, so there is no peak window to avoid and no overnight discount to shift into. That simplifies things: every kilowatt hour costs the same whenever you buy it, and every kilowatt hour your array displaces is worth the same whenever it lands.

On top of the energy charge sits a basic monthly charge of $9.84. Two things about that figure are worth knowing. It is the standard residential basic charge, and a service rated above 200 amps carries a further $9.84 on top of it, so a larger residential service pays the basic charge twice. Both figures took effect on January 1, 2026 under Public Utilities Board Order 1/26.

Solar does not offset the basic charge. Net billing works on energy, so even an array that covers your full annual consumption leaves the monthly basic charge on the account, along with any taxes and charges that apply to it. Any projection showing a Morden bill reaching zero has misunderstood the account structure, and that is a useful test to run against a proposal before looking at anything else in it.

Getting connected, and the price you get connected at

Connecting a system means signing an Excess Energy Purchase Agreement and submitting an Interconnection Request to Manitoba Hydro, and having a bi-directional meter installed so that imports and exports are measured separately. The agreement is what establishes that the utility will buy your surplus, and the meter is what makes the arithmetic possible. Neither is optional, and both should appear on an installer's schedule rather than surfacing after the panels are up.

The excess energy price is not fixed for the life of the system. The current price of $0.07173 per kWh is in effect until March 31, 2027, and it is reset each year. Since 2020 that price has ranged from $0.02403 to $0.07173 per kWh, so today's figure sits at the upper end of its recent range and a lower one is well within precedent.

That history is the reason to be careful with long-run projections. A twenty-five year payback model that holds the export price at today's number for the whole period is assuming something the recent record does not support. A more defensible way to read a Morden proposal is to check how it behaves if the export price falls back toward the lower end of that range, which is another argument for designing around self-consumption rather than around export volume.

Permits and inspections in Morden

Morden requires a building permit for new construction, additions, attached garages, detached accessory buildings, decks above grade, basement development and similar work, and for any building over 10 square metres. Replacing shingles, siding, doors or windows with the same material needs no permit. The city's published list does not name solar arrays in either direction, which means the sensible move is to ask the building department about your specific installation rather than assuming from the list.

Ask early, because one Morden rule has teeth: starting work without an approved permit doubles the fee. That is a straightforward penalty for getting the sequence wrong, and it applies whether the omission was deliberate or an honest reading of an ambiguous list.

Electrical hookup is handled separately, through Manitoba Hydro rather than the city. So a Morden project can involve two parallel tracks, the municipal building question and the utility interconnection, and they are not administered by the same people. Agree with your installer who is responsible for each, and make sure the answer is not that each assumed the other had it.

Morden roofs, and the small number with heritage strings

Morden has 3,995 dwellings, of which 66.8 percent are single-detached houses with an independent roof. Low-rise apartments account for 11.6 percent, row housing 8.4 percent, semi-detached homes 5.9 percent, duplexes 0.9 percent and high-rise units 1.1 percent. So two thirds of local households are in the straightforward position where the roof decision is theirs alone, and roughly a fifth are in a building where a landlord, a co-owner or a shared wall enters the conversation.

There are no homeowners associations in Morden. What exists instead is a city heritage register on which specific properties have been individually designated, such as 577 Stephen Street and Maple Leaf School, designated a Municipal Heritage Site in 1988. Most homes carry no designation and face no heritage constraint on exterior changes at all. Only the specifically listed addresses do, so the question is simply whether yours is one of them, which the city can answer.

Beyond ownership and heritage, the ordinary roof questions apply. Which planes face closest to south, what pitch they carry, how the mounting ties into the structure and, importantly, how old the roof covering is. Replacing shingles under an installed array costs considerably more than doing the two jobs in the right order, so if the roof is within a few years of needing work, deal with that first.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Manitoba Hydro net billing

Manitoba Hydro uses net billing, not net metering, and says so itself: you generate for your own use and sell the surplus for a monetary credit rather than banking kilowatt-hours. Exports are bought at a posted excess energy price of $0.07173 per kWh, in effect until 31 March 2027, against a residential energy charge of 9.970 cents per kWh effective 1 January 2026, so a kilowatt-hour used in the home is worth more than one exported. That export price is reset each year and has ranged from $0.02403 to $0.07173 since 2020, so the current figure is the high end of its own history rather than a fixed rate. Generators must be under 100 kW. The residential basic charge is $9.84 a month, with a further $9.84 on a service over 200 amps. Manitoba Hydro is the sole electricity supplier in the province, so these terms apply throughout Manitoba.

Your utility

Manitoba Hydro

net billing

$0.07173 per kWh (7.173 cents per kWh) excess energy price, in effect until March 31, 2027; the price is reset each year and has ranged from $0.02403 to $0.07173 since 2020

View Manitoba Hydro solar policy details →

How payback works in Manitoba

System cost
$24,866
Estimated net cost
$24,866
Estimated payback
~14.0 years
25-year net savings
~$19,538

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Does Manitoba Hydro offer net metering in Morden?
No. Manitoba Hydro runs net billing rather than net metering. Exported electricity is purchased at an excess energy price, currently $0.07173 per kWh, while the electricity you buy is charged at the residential rate of 9.970 cents per kWh. Because those are different prices, electricity you use in the house as it is generated is worth more to you than electricity you export.
Is there still a Manitoba Hydro solar rebate?
No. Manitoba Hydro's Solar Energy Program rebate closed in 2018 and is not available to a homeowner installing today. Efficiency Manitoba has run residential programmes and its offerings change, so it is worth checking what is currently open before you buy, but do not treat the old Manitoba Hydro rebate as something you can still apply for.
Do I need a building permit for solar panels in Morden?
The city's published permit list does not name solar arrays either way, so ask the building department about your specific installation before work starts. Getting it wrong is expensive: starting work without an approved permit doubles the fee in Morden. Electrical hookup is separate and goes through Manitoba Hydro rather than the city.
Will the export price I get today stay the same?
Not necessarily. The excess energy price of $0.07173 per kWh is in effect until March 31, 2027 and is reset each year. Since 2020 it has ranged from $0.02403 to $0.07173 per kWh, so the current figure sits at the top of its recent range. Ask how a proposal's payback looks if the price falls back toward the lower end of that range.

Ready to start?

Get matched with a vetted local installer in minutes.