QC · Solar

Solar quotes in Quebec City, QC.

One real quote from a vetted local Quebec City installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Quebec City installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
7 kW
Average system size
$3.00/W
Average cost (CAD)
18 yrs
Average payback
30+
Local installers

Why solar in Quebec City

Quebec City publishes siting rules written specifically for solar panels, and they are firm enough to shape a design before an installer has measured anything. Ground-mounted units belong in the side or rear yard. Panels on a flat roof have to sit back from the façade. A panel on a sloped roof that faces the street or a side yard has to lie flat against the slope rather than being tilted up to a better angle. Your electricity comes from Hydro-Québec on a block rate with no time-of-day pricing, and any surplus banks in kilowatt hours that expire on a fixed schedule. Both of those facts push in the same direction: design for what your household uses, not for the largest array the roof can hold.

Your utility

How Hydro-Québec treats solar.

Hydro-Québec is Quebec City's electricity distributor. A homeowner applies for net metering (mesurage net) under Hydro-Québec's option d'autoproduction: a licensed CMEQ electrician must file the installation request, and Hydro-Québec evaluates network capacity before conditional acceptance. Self-generation is capped at 1,000 kW, and surplus kWh credits bank in an account that resets every 24 months. Residential Tarif D bills on a two-tier block rate, not time-of-use.

Source: hydroquebec.com

Permits in Quebec City

Quebec City publishes its own siting rules for solar panels (ground, roof and wall-mounted) in a dedicated 'Panneau solaire' information sheet used to check permit applications. General construction/renovation permit files are reviewed by the city in roughly 30 to 60 business days once complete.

Source: ville.quebec.qc.ca

Where Quebec City lets you put the panels

Quebec City's zoning norms address solar panels directly, and the constraint is placement rather than permission. A ground-mounted array has to sit in the side or rear yard and cannot exceed 3 m in height. On a flat roof, panels need a 2.5 m setback from the façade and cannot rise more than 2 m above the roof surface. On a sloped roof, a panel on a slope that faces the front or a side yard has to be installed lying flat against that slope rather than tilted up on a frame.

That last rule is the one that changes system design rather than just its paperwork. Tilt is how a panel gets a squarer angle to a low winter sun, and a panel laid flush against a shallow pitch collects less over a year than the same panel racked to a steeper angle. Flush mounting also sheds snow more slowly. If the slope facing the street happens to be your sunniest aspect, you are choosing between a flush array on the good aspect and a tilted array on a worse one, and that trade-off belongs in the quote comparison rather than being discovered on installation day.

Ask anyone quoting your roof to put three things in writing: which slope they intend to use, whether that slope faces the front or a side yard, and whether the mounting is flush or tilted. Those answers between them decide whether the design complies and roughly what it will produce.

Permits, the solar information sheet and review times

The city publishes a dedicated Panneau solaire information sheet covering ground, roof and wall-mounted units, and that sheet is what staff use to check permit applications. This is more useful than it sounds. It means the standard you will be measured against is published in advance, so a design can be checked against it before anything is filed rather than after a refusal.

General construction and renovation permit files are reviewed in roughly 30 to 60 business days once the file is complete. The operative words are once complete. A submission missing a drawing, an equipment specification or a site plan does not hold its place at the front of that window, so the gap between a well-prepared file and a thin one is usually counted in weeks rather than days.

Work backwards from when you want the system generating. Permit review, then installation, then the utility side. Output from a rooftop array at this latitude in December is a small fraction of what the same array makes in June, so a project that slips from spring into late autumn gives up its first strong season and starts paying its way a year later than planned.

Hydro-Québec, Tarif D and what a kilowatt hour is worth

Hydro-Québec is the distributor in Quebec City, and the residential rate is Tarif D, a two-tier block rate. The first block of daily consumption is billed at 7.065 cents per kilowatt hour as of April 2026, and consumption above that block is billed at a higher rate. It is not a time-of-use rate. There are no peak periods, no off-peak periods and nothing to be gained by moving laundry to the evening, which is worth stating plainly because a great deal of general solar advice assumes the opposite.

Because the blocks stack, the kilowatt hours a solar array removes come off the top of your consumption, which is the part billed in the upper block. That is the most favourable way the arithmetic can work, and it favours households whose consumption regularly runs well into that upper block over households that rarely leave the first one.

The application itself is not something you file. A licensed CMEQ electrician submits the installation request, and Hydro-Québec evaluates whether the local network has capacity to accept your generation before it issues a conditional acceptance. Self-generation is capped at 1,000 kilowatts, which no house approaches, so the cap is not your constraint. The capacity evaluation is: it is specific to your address and it takes time that has to sit in the schedule.

Sizing around the 24 month surplus reset

Exports are credited one for one in kilowatt hours into a surplus bank, and that bank pays down later consumption rather than converting into money. In practice, a spring and summer surplus is what carries you through short December days, and because the credit is held in energy rather than dollars it keeps pace with the rate.

What the bank does not do is accumulate indefinitely. It is reset to zero every 24 months, on 31 March of each even year. Whatever balance is standing at that moment is settled at Hydro-Québec's average cost of supply, which is well below the retail price you pay to buy the same kilowatt hour back, and the arrangement is written so that it cannot leave you with a negative bill.

So the honest sizing rule here is to match annual production to annual consumption and stop. Roof area that generates more than your household will consume before the next reset is roof area working for very little. This deserves particular attention in Quebec City, because the flush-mounting rule on street-facing slopes can push a design toward more panels to reach the same output, and more panels is exactly the direction the reset punishes. Do the arithmetic against the annual consumption on your own Hydro-Québec bills.

The LogisVert grant and what is left federally

The one substantial subsidy is Hydro-Québec's LogisVert solar grant, and it is structured per kilowatt: $1,000 for each kilowatt of installed capacity, subject to a ceiling of 40 percent of eligible project costs. Hydro-Québec puts the typical residential outcome at $5,000 to $6,000. Its own projection is that this moves a typical residential payback from 25 to 30 years down to roughly 10 to 12, which is the programme administrator's modelling and not a quote for your address.

Two conditions do most of the damage when they are missed. The installation must be completed on or after 30 June 2025, and the application has to be filed within 9 months of the installation date through the LogisVert portal. Nine months sounds generous and is not, because the clock starts on installation day, while your attention has usually moved on by then.

Federal support has thinned considerably. The interest-free Canada Greener Homes Loan of up to $40,000 stopped taking new applications on 2 October 2025 and now only funds loans already approved. The Canada Greener Homes Affordability Program that replaced it launched in September 2025 and delivers no-cost retrofits through provincial partners to low and median income households; solar is eligible at the federal level, but each province sets its own technology list, so eligibility does not follow automatically. There is no Canadian equivalent of a residential investment tax credit.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Hydro-Québec option d'autoproduction

Hydro-Québec's option d'autoproduction is 1:1 net metering in kilowatt-hours: surplus kWh enter a banque de surplus and are deducted from later consumption at the customer's own tariff prices, and article 2.50 of the 2026 tariff keeps the bill from going negative. The bank is zeroed every 24 months, on 31 March of an even year, and article 2.51 credits any remaining balance to the account at the average cost of supply, 4.730 cents per kWh, rather than paying it out. Self-generation is capped at 1,000 kW. Residential Tarif D is a two-tier volumetric rate, not time-of-use: 7.065 cents per kWh on the first block (40 kWh times the days in the period) and 11.142 cents on the rest. Six municipalities run their own distributors (Sherbrooke, Saguenay's Jonquière borough, Alma, Magog, Baie-Comeau and Westmount) and are not on this arrangement, as is part of Saint-Hyacinthe, served by the Coopérative d'électricité de Saint-Jean-Baptiste.

Your utility

Hydro-Québec

net metering

1:1 kWh credit banked in a banque de surplus and deducted from later consumption; the bank is reset to zero every 24 months (31 March of each even year) and any positive balance is paid out at the average cost of supply of 4.730 cents per kWh

View Hydro-Québec solar policy details →

How payback works in Quebec

System cost
$23,953
Estimated net cost
$23,953
Estimated payback
~18.0 years
25-year net savings
~$9,315

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Can I put panels on the roof slope that faces the street?
Yes, but they have to lie flat against that slope rather than being tilted up on a frame. The same rule applies to a slope facing a side yard. On a flat roof, panels need a 2.5 m setback from the façade and cannot exceed 2 m in height, and a ground-mounted array has to go in the side or rear yard with a 3 m height limit.
How long does a Quebec City permit take?
The city reviews general construction and renovation permit files in roughly 30 to 60 business days once the file is complete, and applications are checked against its published Panneau solaire information sheet. An incomplete file does not hold its place in that window, so it pays to submit drawings and equipment specifications together rather than in instalments.
Am I billed more for electricity at peak hours?
No. Hydro-Québec's residential Tarif D is a two-tier block rate, not a time-of-use rate, so there are no peak or off-peak periods in Quebec City. What varies is the block: the first slice of daily consumption is billed at 7.065 cents per kilowatt hour as of April 2026 and consumption above it costs more per kilowatt hour.
What happens to surplus electricity I never use?
It sits in a surplus bank as kilowatt hours and offsets later consumption. Every 24 months, on 31 March of an even year, the bank resets to zero, and any balance left at that point is settled at Hydro-Québec's average cost of supply rather than the retail rate. The arrangement cannot produce a negative bill, so surplus beyond what you will use is worth very little.
How much is the Quebec solar grant worth?
Hydro-Québec's LogisVert grant pays $1,000 per kilowatt of installed capacity and is capped at 40 percent of eligible project costs, which Hydro-Québec describes as typically $5,000 to $6,000 for a residential system. The installation has to be completed on or after 30 June 2025, and you have 9 months from installation to apply through the LogisVert portal.

Ready to start?

Get matched with a vetted local installer in minutes.