SK · Solar

Solar quotes in Regina, SK.

One real quote from a vetted local Regina installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Regina installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
8 kW
Average system size
$2.90/W
Average cost (CAD)
12 yrs
Average payback
25+
Local installers

Why solar in Regina

Regina is unusually well organised about solar permits, and the requirement it makes is the one homeowners most often overlook. A building permit is required whenever panels are installed on roof or wall structures, and the application asks for structural details of the mounting system plus confirmation that the roof can actually support the added load. That is a structural engineering question, not a paperwork question, and it is worth raising with an installer before a quote is signed. The city publishes a dedicated Solar Panel Permit Application Package and a checklist, and says processing typically takes 2 to 4 weeks. Three separate bodies are involved before a system is live.

The permit asks whether your roof can take the load

Regina requires a building permit whenever solar panels are installed on roof or wall structures, and the application requires two things beyond the usual: structural details of the mounting system, and confirmation that the roof can support the added load. Many municipalities ask for a permit; fewer make the structural question explicit on the form.

That matters because it moves a technical risk from after the installation to before it. An array adds dead load and, in Saskatchewan, changes how snow accumulates on a roof. If your roof cannot carry it, you want that established at the application stage rather than discovered later. Ask your installer who produces the structural confirmation and whether an engineer's involvement is included in their price or billed separately.

The city publishes a Solar Panel Permit Application Package and a Solar Panels application checklist, and applications go through the online permitting portal. Ask for the current checklist and check the assembled application against it before it is submitted. Processing typically takes 2 to 4 weeks, which is a usable planning figure, though a returned application restarts your position in the queue.

The city's number for permit enquiries and inspections is 306-777-7551. Use it early rather than late: a five minute call confirming what the checklist wants for your specific roof is cheaper than a returned application.

Three organisations, and none of them speaks for the others

The building permit is the city's. The electrical permit is not: Regina directs applicants to obtain electrical permits from the power utility and to contact SaskPower. Inspections and permits for electrical work involve the Technical Safety Authority of Saskatchewan, TSASK. And the net metering agreement itself is SaskPower's.

So a Regina project touches three organisations with three processes, and an approval from one tells you nothing about the others. The common failure is assuming the installer is handling all of it because they mentioned handling the permit. Ask specifically, for each of the three, who files, who pays and who follows up, and get that in writing.

Sequence matters too. The structural question sits with the city, the interconnection study sits with SaskPower, and the electrical inspection sits with TSASK. Draw all three on one timeline before equipment is ordered, and do not accept a payment schedule tied to an installation date rather than to the approvals.

What SaskPower pays, and what it charges to connect

SaskPower has the exclusive right and obligation to supply electricity in the province except in Swift Current and most of Saskatoon, so in Regina it is your utility without ambiguity. Its Net Metering Program is open to new applicants for systems up to 100 kW, far above what a house needs.

Connecting carries a 315 $ interconnection study fee and at least 498.75 $ for the bi-directional meter, so over 800 $ before equipment goes up, with the meter figure a floor rather than a fixed price. Check whether the quote you are comparing includes both.

Exported generation earns a 7.5 cents per kilowatt hour credit until March 31, 2029, while the residential rate is 15.476 cents per kilowatt hour effective February 1, 2026. Exports are therefore worth under half of what you pay to buy electricity back, which makes self-consumption the design goal rather than annual offset. Ask your installer to model the share of production your household would use as it is generated and to value the rest at 7.5 cents. The rate is flat rather than time-of-use, so there are no peak hours to shift out of, and a 31.16 $ basic monthly charge is billed whatever your roof does.

Grants and financing

There is no provincial solar rebate in Saskatchewan, so nothing offsets the installed cost at the provincial level. The case is built from avoided purchases at 15.476 cents, exports at 7.5 cents, the 31.16 $ monthly basic charge that no array reduces, and the total cost including the connection fees, the permit and any structural engineering the application requires.

That last item is worth pricing rather than assuming. Because Regina's permit asks for confirmation that the roof can support the load, an engineer's report may be part of your project cost in a way it would not be in a city that does not ask. Get it quoted rather than discovering it mid-application.

Federally, the Canada Greener Homes Loan, interest-free up to 40,000 $, stopped accepting new applications on October 2, 2025, and only previously approved loans are still being funded. The Canada Greener Homes Affordability Program replaced it in September 2025, delivering no-cost retrofits through participating provinces, which do not currently include Saskatchewan, for low- to median-income households, with solar PV federally eligible but each province setting its own technology list. Canada has no federal investment tax credit for residential solar.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Net metering programme paying below retail

Saskatchewan's programme is named net metering but works as net billing, so read the mechanism rather than the name. SaskPower credits exports at 7.5 cents per kWh, guaranteed until 31 March 2029, against a residential energy charge of 15.476 cents per kWh effective 1 February 2026; credits offset consumption charges only, never the basic monthly charge or taxes, and are never paid out in cash or transferred. Projects run up to 100 kW DC per meter. Two cities keep their own utilities. Saskatoon Light & Power pays 8.25 cents per kWh to applicants after 26 November 2025, against a 17.02 cent retail energy charge, with the earlier 1:1 rate of $0.114846 surviving only for grandfathered enrollees; it serves the pre-1958 city boundary, while SaskPower serves areas annexed since. Swift Current Light & Power banks a dollar credit at 7.5 cents per kWh against a 17.024 cent retail rate.

Your utility

SaskPower

net billing

7.5 cents per kWh, guaranteed until March 31, 2029; credits offset the energy charge only, cannot be taken as cash, and cannot be applied to the basic monthly charge or taxes

View SaskPower solar policy details →

How payback works in Saskatchewan

System cost
$24,866
Estimated net cost
$24,866
Estimated payback
~12.0 years
25-year net savings
~$26,938

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Do I need a building permit for solar in Regina?
Yes, whenever panels are installed on roof or wall structures. The application requires structural details of the mounting system and confirmation that the roof can support the added load. The city publishes a Solar Panel Permit Application Package and checklist, and processing typically takes 2 to 4 weeks.
Who handles the electrical side?
Not the city. Regina directs applicants to obtain electrical permits from the power utility and to contact SaskPower, and to contact the Technical Safety Authority of Saskatchewan, TSASK, for electrical inspections and permits. Three organisations are involved, and an approval from one says nothing about the others.
What does SaskPower pay for exported solar?
A 7.5 cents per kilowatt hour credit until March 31, 2029, against a residential rate of 15.476 cents. Exports earn under half of what you pay to buy electricity back, so design for using your own generation as it is produced rather than for offsetting an annual total.
What extra costs should I expect?
A 315 $ SaskPower interconnection study fee and at least 498.75 $ for the bi-directional meter, plus the city permit and any structural engineering the load confirmation requires. Ask for all of it to be quoted rather than discovering it during the application.

Ready to start?

Get matched with a vetted local installer in minutes.