NB · Solar

Solar quotes in Dieppe, NB.

One real quote from a vetted local Dieppe installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Dieppe installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
7 kW
Average system size
$3.20/W
Average cost (CAD)
11 yrs
Average payback
25+
Local installers

Why solar in Dieppe

Dieppe roofs return around 1,143 kWh a year for every kilowatt installed, and the city's building permit fee is a known $7.50 per $1,000 of estimated construction cost. What sets a Dieppe project apart from its neighbours in Greater Moncton is the housing. 14.6% of dwellings here are semi-detached, the highest share among the 12 New Brunswick cities researched for this site, and another 7.4% are row housing. A large minority of Dieppe homeowners are making a decision about a roof they share with somebody else. This page covers that, the approval sequence NB Power runs, and what the city expects from you before work starts.

What we install on in Dieppe

Dieppe's housing stock, briefly.

Dieppe's housing is just under half single-detached (48.2%), with a 14.6% semi-detached share alongside row housing and low-rise apartments.

Source: www150.statcan.gc.ca

  • 48.2% single-detached homes.
  • 14.6% semi-detached, meaning many roofs are shared with a neighbour.
  • 20.5% low-rise apartment units, where a landlord controls the roof.
  • 7.4% row housing shares a continuous roofline across multiple units.

Source: www150.statcan.gc.ca

HOA reality: Dieppe's own history and heritage page confirms the city has designated some areas as heritage sites, though it does not name them or spell out what approvals apply to exterior work; check with Planning before assuming heritage rules affect a specific address.
Source: dieppe.ca
Your utility

How NB Power treats solar.

NB Power runs net metering here: apply online, with a target 10 business days for NB Power's own application review, then typically 30 to 90 business days for the installer to complete work, a New Brunswick Department of Public Safety inspection, an AMI meter swap, and grid connection. Systems are capped at 100 kW, need certified equipment and an electrical wiring permit, and credits are not split into tiered or time-of-use rates.

Source: nbpower.com

Permits in Dieppe

Dieppe's building permit fee is $7.50 per $1,000 of estimated construction cost (minimum $25). The city's own construction page does not list solar panels as a project category or publish a turnaround time, so confirm requirements with the city before installing.

Source: dieppe.ca

Dieppe has an unusual number of shared rooflines

Just under half of Dieppe's dwellings, 48.2%, are single-detached houses. The distinctive part is what sits next to them: 14.6% semi-detached, the highest share among the 12 New Brunswick cities in this research batch, plus 7.4% row housing on a continuous roofline and 20.5% in low-rise apartment units where a landlord controls the roof.

A shared roofline does not complicate the electrical work. The array connects to your meter, your service panel and your account, and your neighbour's supply is untouched by it. What it complicates is the structure and the future. The roof plane may cross a property line, the racking lands on rafters that can be common to both units, and a re-roof years from now becomes a conversation with whoever lives on the other side of the wall.

Handle that at the start. Establish where your roof ends, get your neighbour's position recorded if any part of the work touches shared structure, and have the installer show you exactly where mounts and penetrations will land. Row housing needs the same treatment across more than one neighbour, which is a longer conversation and a reason to start it early.

If you are in one of the low-rise apartment units, an individual install is not the route. The roof is a building asset, so what works there is a proposal to the owner for a building-scale system rather than a quote for your unit.

From application to switch on, step by step

NB Power runs the interconnection and the sequence is fixed. You apply online. NB Power targets 10 business days for its own review of the application. After that, the work itself typically takes 30 to 90 business days: the installer completes the installation, the New Brunswick Department of Public Safety inspects it, NB Power swaps your meter for an AMI unit, and the system is connected to the grid.

Two conditions run through all of it. The equipment has to be certified, and an electrical wiring permit is required. You cannot legally energize the array before NB Power's written approval, and that approval includes the compatible meter being in place, so the meter swap is not a formality to be tidied up afterwards.

The useful thing about seeing the sequence written out is knowing where the time actually goes. The paperwork review is the short part. The installation, inspection and meter stage is the part that stretches, and it is scheduled around installer availability and inspection dates rather than around your closing date or the start of a heating season.

What an exported kilowatt hour is worth in Dieppe

NB Power credits exports at the same volumetric rate you pay to buy power, one for one, and the credits are not split into tiered or time-of-use bands. There is no cheap hour and no expensive hour to design around, which means the usual advice about running the dishwasher at midday does not apply here. Generate when the sun allows and the credit is worth the same.

Credits roll from month to month and then zero out every March 31, with no payout for whatever is left. Systems are capped at 100 kW, far above anything residential, so the real limit is that annual reset. Size the array against a full year of your own electricity use, and treat surplus generation as something you give away rather than something you bank.

The Dieppe permit counter, and the pages to look for

Dieppe charges $7.50 per $1,000 of estimated construction cost for a building permit, with a $25 minimum. The fee is public and predictable. What is not published is a turnaround time, and the city's construction page does not list solar panels as a project category, so there is nothing that tells you how a solar application will be handled. Confirm requirements with the city before you set an install date.

One practical note when you or your installer go looking. Dieppe's construction information sits under amenagement-et-construction on the city site and its heritage material under histoire-et-patrimoine, with English versions of the same pages available. Searching in English can miss the page you want, so it is worth navigating the city's own menus rather than relying on a search engine to land you in the right place.

Heritage is a live question in Dieppe without being a clearly mapped one. The city's own history and heritage page confirms that some areas have been designated as heritage sites, but it does not name them or spell out what approvals apply to exterior work. Do not assume your address is affected and do not assume it is not: ask Planning about the specific property before the design is locked in.

What is left of the financial help

NB Power's Total Home Energy Savings Program used to pay $200/kW toward residential solar, capped at $3,000 on a 15 kW system. Solar enrolment closed on May 27, 2026, so it is not part of a new Dieppe project and should not be showing up as a deduction in a current quote. If it does, the quote was built from an old template.

The federal Clean Technology ITC does not fill the gap. It is limited by the Income Tax Act to taxable Canadian corporations and certain trusts, so an individual homeowner cannot claim it. Whether a particular household project qualifies depends on eligibility rules worth confirming with an accountant before they go into anyone's payback calculation, rather than after.

Incentives & rebates

Last verified:

Provincial Closed

Total Home Energy Savings Program (Solar)

$0.20/W (max $3,000)

NB Power residential efficiency program that previously covered rooftop solar. Solar enrollment is closed to new applicants; net metering remains available.

View official source → Updated
Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: NB Power Net Metering Program

NB Power credits exported electricity at the same volumetric rate you'd otherwise pay for power, a true 1:1 credit rather than a reduced buy-back rate. Unused credits roll over month to month, but reset to zero every March 31, so anything left at year-end is forfeited rather than paid out. Systems are capped at 100 kW of nameplate capacity, and before switching on you need an electrical wiring permit, a Department of Public Safety inspection, and written NB Power approval, which includes installing a compatible meter. NB Power has asked its regulator to replace this 1:1 structure with a net billing model featuring separate buy and sell rates plus a demand charge; as of August 2026 that proposal is still under review and has not taken effect, with existing participants to be grandfathered onto current rules for up to 10 years if it is approved.

Your utility

NB Power

net metering
View NB Power solar policy details →

How payback works in New Brunswick

System cost
$23,953
Estimated net cost
$23,953
Estimated payback
~11.0 years
25-year net savings
~$30,486

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Can I install solar on a semi-detached house in Dieppe?
Usually yes, and it is a common case here: 14.6% of Dieppe dwellings are semi-detached, the highest share among the 12 New Brunswick cities researched for this site. The array connects only to your own meter and panel, so your neighbour's electricity supply is not involved. What needs settling first is structural: where your roof plane ends, which rafters carry the mounts, and how a future re-roof gets handled.
How long does it take from signing to switching the system on?
NB Power targets 10 business days to review the application itself. After that, the installation, the New Brunswick Department of Public Safety inspection, the AMI meter swap and the grid connection typically take 30 to 90 business days between them. The system cannot be energized before NB Power's written approval and the new meter are both in place.
What does a building permit cost in Dieppe?
Dieppe charges $7.50 per $1,000 of estimated construction cost, with a $25 minimum. The city's construction page does not list solar as a project category and publishes no turnaround time, so confirm how your project will be treated and how long it will take before scheduling the work.

Ready to start?

Get matched with a vetted local installer in minutes.