Solar quotes in Montague, PE.

One real quote from a vetted local Montague installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Montague installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
7 kW
Average system size
$3.20/W
Average cost (CAD)
10 yrs
Average payback
10+
Local installers

Why solar in Montague

Two of the three things that decide a solar project in Montague are known, and one is not. The known parts are provincial: Maritime Electric is your provider, its net metering credits are measured in kilowatt hours and reset every December 31, and the provincial rebate that most PEI solar advice assumes is currently paused for new applications. The unknown part is municipal. We do not hold Montague's permit rules and could not find them in the public record, so this page will tell you what to ask rather than pretend to know. A well oriented roof here produces about 1,086 kilowatt hours a year per kilowatt installed.

Your utility

How Maritime Electric treats solar.

Source: princeedwardisland.ca

What we could not confirm, and the questions that replace it

We do not have Montague's municipal permit requirements, and a search of the public record did not turn up the town's planning bylaws or permit process. Rather than fill that space with a general statement about Prince Edward Island, we are naming the gap, because a confident guess about a permit is worth less than an accurate list of questions.

Do not read the absence as an exemption. Exterior work on a building normally goes through a municipal planning or development process, and a town that has not published solar-specific guidance has not thereby exempted solar from anything. The answer for your address exists at the town office rather than on a website.

Call the town before equipment is ordered and ask four things: whether a development permit, building permit or both are required for a roof-mounted solar installation, what each application must contain, whether any zoning provision limits mounted equipment by size or visibility, and what processing time to expect. Record who answered and the date, and get it by email if you can.

Those questions also test an installer. Someone who has worked in Montague should be able to describe what the town asked for last time and show you the paperwork. Someone who says confidently that nothing is required, without being able to point at where the town says so, is guessing with your money. Do not accept a payment schedule that exposes a deposit to an approval date nobody has promised.

The provincial rebate is paused, which is the bigger number

efficiencyPEI's Solar Electric Rebate Program paid 1,000 $ per kW DC installed, covering up to 40 percent of costs, to a maximum residential rebate of 10,000 $. It is paused for new applications after the programme reached capacity for the fiscal year. Existing pre-approval holders can continue.

Whatever the permit turns out to require, this is the larger financial fact. On a residential system, up to 10,000 $ is a substantial share of the total cost, so any quote, article or payback estimate that assumes the rebate is currently wrong by up to that amount. Ask any installer whether their savings figure includes it, and ask to see the same figure without it.

The stated reason was capacity rather than a decision to close the programme permanently, so the practical issue is timing. Ask efficiencyPEI what the current intake status is, whether new applications are expected to reopen, and exactly what a pre-approval is and whether you hold one. If the rebate is what makes the project work for you, that answer is the project's critical path and it belongs at the front of the conversation.

Maritime Electric, and the December 31 clear-out

Maritime Electric is your provider, and its net metering programme has requirements worth reading before you design anything: a renewable source such as solar or wind, generation exclusively for your own property, year-long billing with Maritime Electric, an application for and participation in a net metering agreement, adherence to the section 13 requirements in that agreement, and a generator not exceeding 100 kW. The size ceiling is far above a house.

The exclusivity clause is the one that catches people out. Generation must be for your own property, so an array on one building cannot offset consumption at another you own. If that is your situation, raise it at the outset.

PEI net metering works in kilowatt hour credits rather than a cash feed-in tariff for households. Credits accumulate through the year and reset on December 31, with no cash payout for unused credits. December 31 sits at the end of the darkest quarter, so a summer surplus has about half a year to be drawn down before it is cleared.

That makes sizing the design decision that matters most. Build to twelve months of your own kilowatt hour totals rather than to the roof area available, because generation beyond your own annual consumption is not banked forward, it is simply lost at the reset. Ask Maritime Electric for the agreement and read section 13 yourself.

The roof, which is the part nobody else decides

Natural Resources Canada puts Montague at about 1,086 kilowatt hours a year per kilowatt of installed capacity on a well oriented, unshaded array. Treat it as a ceiling for your address rather than a forecast, since orientation and shading move the real figure a long way.

A slope facing generally south produces the most, east and west slopes produce usefully but give up output, and a north slope rarely repays the hardware. Shading is the costliest variable because it removes production in the middle of the day when the array would otherwise be strongest, so ask for an assessment that covers the whole year rather than the hour of the site visit.

Check the roof covering age before anything is ordered. Panels outlast most coverings, so one within a few years of replacement should be replaced first rather than paying later to remove and reinstall the array. In a town whose permit requirements you are still confirming, doing the work in the wrong order also risks going through an unknown process twice.

What else is available

Federally the options have narrowed. The Canada Greener Homes Loan, interest-free up to 40,000 $, stopped accepting new applications on October 2, 2025, and only previously approved loans are still being funded, so it is not available to a new project.

The Canada Greener Homes Affordability Program replaced it in September 2025, delivering no-cost retrofits through provincial partners for low- to median-income households. Solar PV is eligible federally, but each province sets its own technology list, so what matters is what Prince Edward Island has actually included. Check that directly, particularly while the provincial rebate is paused.

Canada has no federal investment tax credit for residential solar. So unless you hold a pre-approval or the provincial programme reopens, the honest arithmetic today is the value of self-generated and credited electricity over time, against the full installed cost with no rebate and whatever the town's permit turns out to cost. Get both of those unknowns answered before you sign anything.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Net metering under the Renewable Energy Act

Prince Edward Island runs genuine 1:1 net metering, set by section 13 of the Renewable Energy Act: the kilowatt-hours a customer supplies are subtracted from the kilowatt-hours delivered, and a monthly surplus is credited to the account in kilowatt-hours. Those credits hold no cash value, and on 31 October each year any credits outstanding from the preceding calendar year expire unless the net metering agreement sets another compliant date. Generators are capped at 100 kW, and installations of 30 kW and larger may need three-phase service. Two utilities apply the same rule separately: Maritime Electric across the Island, and the City of Summerside's own electric utility within Summerside. Both charge 17.84 cents per kWh on the first 2,000 kWh of a billing period and 14.23 cents above that, effective 1 August 2026, and a net metering customer pays one service charge even though two meters are installed.

Your utility

Maritime Electric

net metering

1:1 credit measured in kilowatt-hours: the kWh supplied to the utility during a billing period are subtracted from the kWh delivered, and any surplus is banked as kWh energy credits that hold no cash value. Credits from the preceding calendar year expire on October 31 unless the net-metering system agreement specifies another date.

View Maritime Electric solar policy details →

How payback works in Prince Edward Island

System cost
$23,953
Estimated net cost
$23,953
Estimated payback
~10.0 years
25-year net savings
~$35,930

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Do I need a permit for solar panels in Montague?
We do not know, and we will not guess. Our record does not carry the town's permit rules and a search of the public record did not return them. That is a gap rather than an exemption. Call the town and ask whether a development permit, building permit or both apply to a rooftop installation at your address.
What should I ask the town?
Which permits a roof-mounted installation requires, what each application must contain, whether any zoning provision limits mounted equipment by size or visibility, and what processing time to expect. Record who answered and when, by email if possible, since that response will be your documentation.
Can I get the PEI solar rebate?
Not as a new applicant. The Solar Electric Rebate Program is paused after reaching capacity for the fiscal year, though existing pre-approval holders can continue. It paid 1,000 $ per kW DC up to 40 percent of costs and a maximum of 10,000 $, so a quote assuming it overstates your outcome by up to that amount.
How should I size the system?
To twelve months of your own kilowatt hour totals, not to available roof area. PEI net metering credits are measured in kilowatt hours and reset every December 31 with no cash payout for unused credits, so generation beyond your own annual consumption is lost at the reset rather than carried forward.