NU · Solar + Battery

Solar + battery installation in Nunavut

Battery-coupled solar is the package that closes most often in Nunavut. Federal Clean Tech ITC (30%) on storage stacks with provincial net metering. Free quote, ~2 minutes.

Get my free solar + battery quote
5 kW
Average system size
$5.00/W
Average cost (CAD)
14 yrs
Average payback
2+
Local installers

Why solar in Nunavut

Nunavut's electricity price is high enough to change the arithmetic entirely, and its constraints on doing anything about it are the tightest in the country. Qulliq Energy Corporation is the only generator and distributor in the territory, running 25 stand-alone diesel plants in 25 communities with no interconnection and no backup grid. Its net metering programme is genuine 1:1: generation is measured against consumption and the bill is calculated from the net, with excess credits reset on 31 March each year. The residential non-government rate is 74.94 cents per kWh, so every kilowatt-hour you offset carries that value, which is why the arithmetic works here despite the winter. The limits are the difficulty. System capacity must not exceed 15 kW AC, eligibility covers residential customers plus two municipal accounts per hamlet, QEC sets a community limit on total net metered power, and generation on a distribution feeder section cannot exceed 7 percent of that section's annual peak load. Because each community is its own grid, headroom is specific to where you live, and QEC advises customers not to buy a system before their application is approved.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Qulliq Energy net metering, capped at 15 kW AC

Qulliq Energy Corporation is the only generator and distributor in Nunavut, running 25 stand-alone diesel plants in 25 communities with no interconnection and no backup grid. Its net metering programme is genuine 1:1: electricity generated is measured against electricity consumed and the bill is calculated from the net total, with excess generation credits reset on 31 March each year. The residential non-government rate is 74.94 cents per kWh, so every offset kilowatt-hour carries that value. The programme is capped and narrowly scoped: system capacity must not exceed 15 kW AC, eligibility covers residential customers plus two municipal accounts per hamlet, QEC sets a community limit on total net metered power, and generation on a distribution feeder section cannot exceed 7 percent of that section's annual peak load. Because each community is its own grid, headroom is community-specific, and QEC advises customers not to buy a system before their application is approved.

Start your Nunavut quote

Tell us where your home is and we will match you with a vetted local installer.

How payback works in Nunavut

System cost
$19,728
Estimated net cost
$19,728
Estimated payback
~14.0 years
25-year net savings
~$15,501

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Cities we serve in Nunavut

3cities with vetted local solar + battery installers.

Frequently asked questions

Does solar work in Nunavut?
Yes, particularly in summer: Iqaluit ranks above Halifax and Vancouver for photovoltaic potential. Retail rates on diesel grids run high enough that any production is valuable, and Qulliq Energy Corporation's net metering is genuine 1:1, measuring what you generate against what you consume. Winter darkness is the real constraint, which is why storage comes up in almost every conversation here.
What incentives are available in Nunavut?
Territorial and federal northern-energy programmes are where the funding is, and most deployment in Nunavut is community-scale or off-grid rather than a single household on a grid. Confirm which programmes are currently open before purchase. The federal Clean Technology ITC is not one of them for a homeowner: it is a corporate credit under Income Tax Act subsection 127.45(1).
Is battery storage required in Nunavut?
Practically yes. Winter darkness, outage frequency and high diesel-generated rates all make storage the value driver rather than an add-on, and Qulliq runs 25 stand-alone plants with no interconnection and no backup grid, so there is nothing to fall back on. Budget for it directly, because no federal tax credit is available to a homeowner to offset it.