One real quote from a vetted local Selkirk installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Selkirk installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
8 kW
Average system size
$3.00/W
Average cost (CAD)
14 yrs
Average payback
20+
Local installers

Why solar in Selkirk

Selkirk is mostly houses: 61.4 percent of its 4,415 dwellings are single-detached, so most homeowners here control their own roof. The provincial rule that shapes the economics is that Manitoba Hydro runs net billing rather than net metering, buying excess power from systems under 100 kW at $0.07173 per kWh, currently set through March 31, 2027 and reset yearly, against a flat residential energy charge of 9.970 cents per kWh with no time-of-use periods. Locally, the detail worth knowing before you start is documentary: a Selkirk renovation permit application needs a Status of Title issued within 30 days of the application, which is a document you have to order rather than one you already have in a drawer.

What we install on in Selkirk

Selkirk's housing stock, briefly.

Selkirk's 4,415 dwellings (2021) are 61.4% single-detached, with 21.5% low-rise apartments, 7.6% row houses, 5.9% high-rise, 3.1% semi-detached and just 0.2% duplexes. A solid majority of homes are detached with their own roof for a solar install.

Source: www150.statcan.gc.ca

  • 61.4% of Selkirk's 4,415 dwellings are single-detached, suited to a rooftop PV system.
  • 21.5% are low-rise apartments and 5.9% high-rise, over a quarter of the stock where residents do not control the roof.
  • Duplexes are almost absent here (0.2%).

Source: www150.statcan.gc.ca

Your utility

How Manitoba Hydro treats solar.

Manitoba Hydro is Selkirk's sole electricity distributor, regulated by the Public Utilities Board. Residential service is a flat energy charge (9.970 cents/kWh) plus a basic monthly charge ($9.84 up to 200A), not time-of-use. Homeowners with solar get 'net billing,' not 1:1 net metering: systems under 100kW sell excess power back at a separate excess energy price, currently $0.07173/kWh through March 31, 2027, reset yearly. Apply by emailing Manitoba Hydro's customer generation team.

Source: hydro.mb.ca

Permits in Selkirk

A Selkirk renovation or accessory-building permit application requires construction drawings, a floor plan, plumbing schematics if applicable, and a Status of Title issued within 30 days of the application. The City's permit pages do not mention solar panels specifically, and no fee schedule or review-time target is published for this category.

Source: myselkirk.ca

Net billing, and the two prices behind it

Manitoba Hydro is Selkirk's sole electricity distributor and its rates are regulated by the Public Utilities Board. Residential service is a flat energy charge of 9.970 cents per kWh plus a basic monthly charge, with no time-of-use pricing, so no hour of the day is priced differently from another and there is no rate arbitrage to chase.

Solar households are on net billing rather than one-for-one net metering: systems under 100 kW sell excess power back at a separate excess energy price, currently $0.07173 per kWh through March 31, 2027, reset yearly. That gives a solar kilowatt-hour two possible values. Consumed in the house it displaces 9.970 cents of energy charge. Exported it earns $0.07173. Raising the share you consume yourself is therefore the simplest way to improve the return on a given system, and running flexible loads during daylight hours costs nothing to do.

The same logic caps how large a system is worth building. Once an array regularly produces more during the day than the household can absorb, the surplus sells at the lower price and each additional panel earns less than the last. Applications are made by emailing Manitoba Hydro's customer generation team, and because the export price runs only through March 31, 2027 and is reset yearly, asking them to confirm the current figure in writing before signing is worth the email.

The document that catches people out

A Selkirk renovation or accessory-building permit application requires construction drawings, a floor plan, plumbing schematics where applicable, and a Status of Title issued within 30 days of the application. That last item is the one that surprises homeowners, because it is not a document most people keep on hand and its currency is tested: a title obtained months earlier does not satisfy a 30 day window. Order it in step with the rest of the package rather than first, or you can find yourself renewing it because the drawings took longer.

The City's permit pages do not mention solar panels specifically, and no fee schedule or review-time target is published for this category. So the requirements are documented but the treatment of a solar array is not, which makes an early conversation worthwhile: describe the mounting method, ask whether a structural report is expected for your roof, and confirm which permit category the work falls into before you build a schedule around it.

Manitoba has no US-style homeowners' associations, and we have no verified record of a heritage designation or architectural-review overlay applying to properties in Selkirk. That is an absence of information rather than a guarantee that none applies, so ask the City the same question while you are confirming the permit category.

The charge solar cannot touch, and the 200 amp line

A solar array offsets energy, not the cost of being connected. Manitoba Hydro's residential basic monthly charge is $9.84 at 200 amps or below, and it stays on the bill in full no matter how much your panels produce. That matters when you are reading a proposal that describes a system as covering your bill: it can cover the energy portion of it and still leave the basic charge standing.

The threshold behind that figure is worth checking before you choose a system size. A service above 200 amps adds a further $9.84 to the basic charge, so a project that pushes your service past that line carries an ongoing monthly cost as well as the one-off price of the upgrade. Ask directly whether the proposed design needs a service upgrade, because two quotes that look similar on equipment can differ sharply on this point, and the difference persists for as long as you own the house.

Production in Selkirk and who controls the roof

Natural Resources Canada's photovoltaic dataset puts Selkirk at 1,267 kWh a year for each kW of installed capacity on an unobstructed installation. A 5 kW array on that basis produces roughly 6,335 kWh a year and an 8 kW array roughly 10,140 kWh. Compare either against the annual consumption on your own bills, since under net billing the share your household absorbs decides the value rather than the headline output. Shade, an east and west split rather than a single south-facing plane, and winter snow cover all pull a real roof below the benchmark.

Of Selkirk's 4,415 dwellings, 61.4 percent are single-detached houses, the straightforward case where one owner decides. Low-rise apartment buildings account for 21.5 percent and high-rise buildings 5.9 percent, so over a quarter of the stock is housing where a resident does not control the roof and any system is a building-wide decision. Row houses at 7.6 percent and semi-detached homes at 3.1 percent share roof structure with a neighbour, which brings load path, flashing across a shared assembly and documented consent forward in the process. Duplexes are almost absent at 0.2 percent.

On a house you control, the assessment is short: which planes are unshaded and how they face, how much service life is left in the covering, and whether the electrical service has headroom. A covering near the end of its life should be replaced before an array goes on, since removing and reinstalling panels later to re-roof costs more than doing the work in the right order once.

What help actually exists

Manitoba Hydro's Solar Energy Program, the rebate that older articles and forum threads still describe, closed in 2018. It is not available, and any quote or calculator that assumes it is wrong. Efficiency Manitoba's programme lineup changes over time, so verify its current offerings directly with Efficiency Manitoba rather than relying on any third party, this page included.

We have no verified record of a current Manitoba residential solar rebate to point you to. The practical advice that follows is to build a budget that stands up without one, confirm the position yourself with Efficiency Manitoba and with Manitoba Hydro's customer generation team when you apply, and treat anything you find as upside rather than as a line in the plan. A project that only works with a rebate that may not exist is a project that does not work.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Manitoba Hydro net billing

Manitoba Hydro uses net billing, not net metering, and says so itself: you generate for your own use and sell the surplus for a monetary credit rather than banking kilowatt-hours. Exports are bought at a posted excess energy price of $0.07173 per kWh, in effect until 31 March 2027, against a residential energy charge of 9.970 cents per kWh effective 1 January 2026, so a kilowatt-hour used in the home is worth more than one exported. That export price is reset each year and has ranged from $0.02403 to $0.07173 since 2020, so the current figure is the high end of its own history rather than a fixed rate. Generators must be under 100 kW. The residential basic charge is $9.84 a month, with a further $9.84 on a service over 200 amps. Manitoba Hydro is the sole electricity supplier in the province, so these terms apply throughout Manitoba.

Your utility

Manitoba Hydro

net billing

$0.07173 per kWh (7.173 cents per kWh) excess energy price, in effect until March 31, 2027; the price is reset each year and has ranged from $0.02403 to $0.07173 since 2020

View Manitoba Hydro solar policy details →

How payback works in Manitoba

System cost
$24,866
Estimated net cost
$24,866
Estimated payback
~14.0 years
25-year net savings
~$19,538

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

What documents does a Selkirk permit application need?
Construction drawings, a floor plan, plumbing schematics where applicable, and a Status of Title issued within 30 days of the application. The title document is the one people miss, because its currency is tested against that 30 day window. The City's permit pages do not mention solar specifically and publish no fee schedule or review-time target.
Will a solar system eliminate my Manitoba Hydro bill?
Not entirely. The basic monthly charge of $9.84 at 200 amps or below pays for the connection rather than the energy and stays on the bill regardless of production. A service above 200 amps adds a further $9.84 to that charge, so a design requiring a service upgrade carries an ongoing cost as well as an installation cost.
Is exported power worth the same as power I use?
No. Manitoba Hydro runs net billing rather than net metering. Excess power from systems under 100 kW is bought at $0.07173 per kWh, currently set through March 31, 2027 and reset yearly, while consumption is charged at a flat 9.970 cents per kWh. Using your own generation is therefore worth more than exporting it.

Ready to start?

Get matched with a vetted local installer in minutes.