QC · Solar

Solar quotes in Saguenay, QC.

One real quote from a vetted local Saguenay installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Saguenay installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
7 kW
Average system size
$3.00/W
Average cost (CAD)
18 yrs
Average payback
30+
Local installers

Why solar in Saguenay

In Saguenay the first question is not about your roof, it is about which borough you live in. Jonquiere is served by Hydro-Jonquiere, the city's own municipal utility, while Chicoutimi, La Baie and the other boroughs are Hydro-Quebec customers. That single fact decides which net-metering rules apply to you, which grant you can claim, and who you have to ask before anything is designed. The split traces back to the 2002 merger that created Saguenay, which is also why zoning is still administered borough by borough. Housing here is favourable for solar: 48 percent of dwellings are single-detached, and a well oriented roof yields about 1,144 kilowatt hours a year per kilowatt installed.

What we install on in Saguenay

Saguenay's housing stock, briefly.

Saguenay is a heavily single-detached market: 48% of dwellings, plus a notably high 13.4% duplex share, versus 25.8% low-rise and just 1.6% high-rise.

Source: www150.statcan.gc.ca

HOA reality: Saguenay was formed from the 2002 merger of Chicoutimi, Jonquière, La Baie and smaller municipalities, and the city still administers zoning through separate borough-level règlements d'urbanisme (Chicoutimi, Jonquière and La Baie each have their own conseil d'arrondissement), so rooftop-equipment rules can vary by borough.
Your utility

How your local utility treats solar.

Saguenay is split between two distributors. Hydro-Jonquière, the city's own municipal utility, serves only the Jonquière borough over a 450 km distribution network; it buys about 98% of its power from Hydro-Québec and generates the rest from its own 3,900 kW hydro plant on the Rivière aux Sables. Its residential Tarif D (46.154¢/day access charge, 6.905¢/kWh for the first 40 kWh/day, 10.652¢/kWh after) mirrors Hydro-Québec's two-tier block structure with its own prices. Homeowners in Chicoutimi, La Baie and Saguenay's other boroughs are Hydro-Québec customers instead, under Hydro-Québec's own option d'autoproduction net-metering program.

Source: ville.saguenay.ca

Two distributors in one city, and why it decides everything else

Hydro-Jonquiere is the municipal electric utility for the Jonquiere borough and nowhere else in Saguenay. It runs a 450 km distribution network, buys about 98 percent of its power from Hydro-Quebec and generates the rest at its own 3,900 kW hydro plant on the Riviere aux Sables. Residents of Chicoutimi, La Baie and the city's other boroughs are Hydro-Quebec customers instead.

Check the name on your bill before you do anything else, because the two sides do not work the same way. A Hydro-Quebec customer enrols in the option d'autoproduction, where a licensed CMEQ electrician files the installation request and surplus banks as kilowatt hour credits. A Hydro-Jonquiere customer is dealing with a municipal utility that sets its own terms, and this page will not tell you what those terms are because we have not verified them.

If Hydro-Jonquiere bills you, ask it directly and in writing: whether a customer-owned generator may connect, what happens to electricity you export, what interconnection and metering are required, and at what cost. Do not accept an installer's assurance in place of the utility's answer, because you are the one carrying the risk if the assumption is wrong. Ask about the LogisVert grant in the same conversation, since it is a Hydro-Quebec programme.

What a Hydro-Jonquiere bill looks like

Hydro-Jonquiere's residential Tarif D mirrors Hydro-Quebec's two-tier block structure but with its own prices: a 46.154 cents per day access charge, then 6.905 cents per kilowatt hour for the first 40 kilowatt hours a day and 10.652 cents per kilowatt hour above that. Knowing the shape matters more than knowing the numbers, because it tells you what solar can and cannot do to your bill.

The access charge is the part solar does not touch. It is billed per day regardless of how much your roof generates, so a realistic expectation is a much smaller bill rather than no bill. Anyone promising to take a Jonquiere bill to zero is misreading the tariff.

The two-tier structure works in your favour on the rest. Solar removes consumption from the top of your daily usage, and the top is the part billed at the higher price. The first kilowatt hours an array displaces are the expensive ones, which is why a household that regularly runs past 40 kilowatt hours a day sees more benefit per panel than one that does not. There is no time-of-day component, so there is nothing to gain by shifting when you run appliances.

Zoning is still administered borough by borough

Saguenay was formed in 2002 from the merger of Chicoutimi, Jonquiere, La Baie and smaller municipalities, and more than two decades later the city still administers zoning through separate borough-level reglements d'urbanisme. Chicoutimi, Jonquiere and La Baie each have their own conseil d'arrondissement. The practical consequence is that rules on rooftop equipment can differ between boroughs of the same city.

So the answer a colleague got in Chicoutimi is not evidence about La Baie, and a contractor who mostly works in one borough may be confidently wrong about another. Ask your own borough two questions by address: whether a permit or certificate of authorisation is required for a rooftop installation, and whether any architectural or heritage review applies. Note the name of who answered and the date.

Those same questions double as a test of an installer. Someone who works across Saguenay should be able to tell you which borough you are in and what it asked for last time, and show you the paperwork. Someone who treats the city as one jurisdiction has not done a job here.

The housing stock, and what it means for your roof

Saguenay is a strongly single-detached market: 48 percent of dwellings are single-detached houses, so nearly half of residents control their own roof and can decide alone. The duplex share is notably high at 13.4 percent, and a duplex roof is normally shared, so both owners have to agree and the agreement has to cover fixings, penetrations, access for maintenance and who pays when the covering is replaced. Low-rise buildings are 25.8 percent of the stock, where the roof belongs to a landlord or a syndicate of co-owners, and high-rise is effectively absent at 1.6 percent, so shading from tall buildings is not a local factor.

For a house, production comes down to orientation, shade and the roof covering. An unshaded slope facing generally south produces the most; east and west slopes still produce but give up output; a north slope rarely repays the hardware. Shading costs the most because it removes production in the middle of the day, and it needs assessing across the year rather than on the afternoon of the site visit.

Check the roof covering before anything else. Panels outlast most coverings, so one within a few years of replacement should be replaced first rather than paying later to remove and reinstall the array. In a city where you may also need a borough approval, doing the work in the wrong order means going through that process twice.

Grants and financing

Hydro-Quebec's LogisVert residential solar grant pays 1,000 $ per kW of installed capacity and covers up to 40 percent of eligible project costs, typically landing around 5,000 $ to 6,000 $ on a residential system. Installations must be completed on or after June 30, 2025, and the claim is filed through the LogisVert portal within 9 months of the installation date.

If Hydro-Jonquiere rather than Hydro-Quebec bills your address, confirm eligibility with the programme in writing before you sign a contract. That is the single most valuable phone call available to a Jonquiere homeowner reading this page, because the answer changes the economics of the whole project and it is not one we can answer for you.

Federally the options have narrowed. The Canada Greener Homes Loan, interest-free up to 40,000 $, stopped accepting new applications on October 2, 2025, and only previously approved loans are still being funded. The Canada Greener Homes Affordability Program replaced it in September 2025, delivering no-cost retrofits through provincial partners for low- to median-income households, with solar PV federally eligible but each province setting its own technology list. Canada has no federal investment tax credit for residential solar.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Hydro-Québec option d'autoproduction

Hydro-Québec's option d'autoproduction is 1:1 net metering in kilowatt-hours: surplus kWh enter a banque de surplus and are deducted from later consumption at the customer's own tariff prices, and article 2.50 of the 2026 tariff keeps the bill from going negative. The bank is zeroed every 24 months, on 31 March of an even year, and article 2.51 credits any remaining balance to the account at the average cost of supply, 4.730 cents per kWh, rather than paying it out. Self-generation is capped at 1,000 kW. Residential Tarif D is a two-tier volumetric rate, not time-of-use: 7.065 cents per kWh on the first block (40 kWh times the days in the period) and 11.142 cents on the rest. Six municipalities run their own distributors (Sherbrooke, Saguenay's Jonquière borough, Alma, Magog, Baie-Comeau and Westmount) and are not on this arrangement, as is part of Saint-Hyacinthe, served by the Coopérative d'électricité de Saint-Jean-Baptiste.

How payback works in Quebec

System cost
$23,953
Estimated net cost
$23,953
Estimated payback
~18.0 years
25-year net savings
~$9,315

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Who is my electricity distributor in Saguenay?
It depends on your borough. Hydro-Jonquiere, the city's own municipal utility, serves only Jonquiere. Chicoutimi, La Baie and the other boroughs are Hydro-Quebec customers. Check the name on your bill, because it decides which net-metering rules and which grant apply to you.
Can I get the LogisVert grant in Jonquiere?
Confirm it in writing with the programme before you sign anything. LogisVert is a Hydro-Quebec programme and Jonquiere is served by Hydro-Jonquiere, a separate municipal utility, so eligibility is exactly the question to put to the programme rather than to an installer.
Will solar take my Hydro-Jonquiere bill to zero?
No. The residential Tarif D includes a 46.154 cents per day access charge that is billed regardless of how much your roof generates. Solar reduces the energy part of the bill, not the access charge, so the realistic outcome is a much smaller bill.
Do the same rooftop rules apply across Saguenay?
Not necessarily. Saguenay still administers zoning through separate borough-level reglements d'urbanisme, with Chicoutimi, Jonquiere and La Baie each having their own conseil d'arrondissement, so rooftop-equipment rules can vary. Ask your own borough by address rather than relying on an answer from elsewhere in the city.

Ready to start?

Get matched with a vetted local installer in minutes.