Solar quotes in Granby, QC.

One real quote from a vetted local Granby installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Granby installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
7 kW
Average system size
$3.00/W
Average cost (CAD)
18 yrs
Average payback
30+
Local installers

Why solar in Granby

Granby publishes a list of work that does not need a permit, and roof repairs are on it. Adding new equipment such as solar panels is not, which puts a solar project back into the city's standard permit process through the Service de l'aménagement et de la protection du territoire. That is the single most useful municipal fact for a Granby homeowner, because it settles the question most people ask first. The utility side is settled too: Hydro-Québec is the sole distributor, the residential rate is the two-tier Tarif D rather than a time-of-day rate, and net metering banks surplus in kilowatt-hours rather than dollars, with the bank emptied every 24 months.

What we install on in Granby

Granby's housing stock, briefly.

Granby's housing stock is led by low-rise apartment buildings under five storeys (40.1%), just ahead of single-detached houses (38.8%), with semi-detached at 7.9%, duplexes 7.1%, row houses 1.5% and high-rise apartments a small 1.6%. Just under 40% of homes are ground-oriented houses under a single owner's control, while a comparable share of the stock sits in low-rise multi-unit buildings.

Source: www150.statcan.gc.ca

  • 40.1% of dwellings are in low-rise buildings under 5 storeys, slightly ahead of single-detached houses, so condo syndicate approval is a common hurdle here.
  • 38.8% single-detached homes give a large share of residents direct control over their own roof.
  • 7.1% duplexes and 7.9% semi-detached mean shared-roof decisions come up fairly often.
  • High-rise apartments are rare at 1.6%, so building-wide rooftop governance is uncommon.

Source: www150.statcan.gc.ca

Your utility

How Hydro-Québec treats solar.

Hydro-Québec is the sole electricity distributor in Granby. Solar households apply through Hydro-Québec's option de mesurage net (Option I net metering) on the residential Tarif D: a licensed electrician who is a member of the Corporation des maîtres électriciens du Québec must submit the connection request, and Hydro-Québec issues conditional then final authorization before the system is energized. Surplus production is banked as a kWh credit and cashed out every 24 months. Tarif D is not time-of-use; it is a two-tier block rate, with a lower price for roughly the first 40 kWh/day and a higher rate above that.

Source: hydroquebec.com

Permits in Granby

Granby publishes a list of work that does NOT need a permit, and minor roof repairs are on it (repairing a chimney, fascia, soffite or a few shingles). Adding new equipment like solar panels is not on that exemption list, so it falls back to the standard permit/certificate process through the Service de l'aménagement et de la protection du territoire. The city states processing times vary by permit type and by time of year, and does not publish a specific number of days.

Source: granby.ca

Solar is not on Granby's exemption list

Granby is specific about what does not need a permit. Its published list covers minor roof work: repairing a chimney, fascia or soffit, or replacing a few shingles. Adding new equipment like solar panels does not appear on that list, so a solar project falls back to the standard permit or certificate process through the Service de l'aménagement et de la protection du territoire. Read that as a helpful clarification rather than an obstacle: you know before you start which side of the line your project sits on.

What the city does not give you is a schedule. Granby states that processing times vary by permit type and by time of year, and it publishes no specific number of days. That is worth planning around directly. Submit early, submit a complete application, and ask the service what its current turnaround looks like for the season you are applying in rather than assuming a number. The city says the season itself moves the number, and a complete file is the only part of the timeline you control.

We also have no verified record of an architectural-integration overlay or heritage designation applying to properties in Granby. That is an absence of information rather than a guarantee that none applies, so ask the same department whether any architectural review attaches to your address when you ask about the permit itself.

Your credit is measured in kilowatt-hours, not dollars

Under Hydro-Québec's option de mesurage net, a Granby household banks surplus production as a kilowatt-hour credit. That distinction matters more than it sounds. A kilowatt-hour credit is indexed to the electricity itself, so it holds its value against a later rate change, and it offsets a later kilowatt-hour of consumption one for one no matter which block of Tarif D that consumption falls into. What it never does is turn into money at the retail price.

The bank is cleared every 24 months, on 31 March of an even year. Whatever positive balance stands at that moment is paid out at a wholesale price, well below the retail rate you pay for electricity you buy. So there are effectively two exchange rates for a solar kilowatt-hour in Quebec: the good one, where you consume it yourself or draw it back out of the bank as consumption; and the poor one, where it is still sitting in the bank at the reset and gets cashed out. Design decisions should aim as much production as possible at the first.

The mechanics of getting connected are the same for every Granby address. A licensed electrician who is a member of the Corporation des maîtres électriciens du Québec submits the connection request, and Hydro-Québec issues conditional and then final authorization before the system may be energized. Tarif D itself is a two-tier block rate, with a lower price for roughly the first 40 kWh a day, so there is no on-peak or off-peak hour to design around.

Output in Granby and how to size against it

Natural Resources Canada's dataset puts Granby at 1,159 kWh a year for each kW of installed capacity, on an unobstructed installation. A 6 kW array on that basis produces around 6,950 kWh a year and a 10 kW array around 11,600 kWh. Line either figure up against the annual consumption on your own bills: with the credit bank resetting every two years, matching your own use is what makes a system pay, and any size chosen for reasons other than that number needs a separate justification.

Local conditions move a real roof off the benchmark in both directions. Shade from trees or a neighbouring building during the afternoon takes a bite out of the total, a split east and west layout produces a flatter curve at a lower annual figure than a single south-facing plane, and snow cover means Quebec production is weighted heavily toward the months between spring and autumn. None of that is a reason to distrust the benchmark; it is a reason to expect a site-specific model and to ask what assumptions it makes.

Roofs, apartments and shared walls in Granby

Granby's housing splits close to evenly between two situations. Low-rise apartment buildings under five storeys hold 40.1 percent of dwellings, where the roof is common property and the syndicate of co-owners makes the call rather than any single owner. Single-detached houses account for 38.8 percent, and those owners decide alone. High-rise apartments are 1.6 percent of the stock, so a building-wide rooftop decision on a tower is an uncommon situation here.

Semi-detached homes at 7.9 percent and duplexes at 7.1 percent put a second dwelling under a shared roof structure, and row houses add 1.5 percent. On any of those, the design questions arrive earlier: how the array's weight is carried across a shared assembly, how a penetration is flashed where the structure continues into the neighbouring unit, and whose consent needs to be documented. Those are answerable questions, but answering them after the panels are ordered is the expensive order to do it in.

Whatever the building type, three physical facts drive the quote: the orientation and shading of the usable roof planes, how much service life is left in the covering underneath, and whether the existing electrical service has room for the array without an upgrade. An installer who has not looked at your panel and your roof covering is estimating two of those three.

Adding a battery, and adding it to the permit

Granby's exemption list is the useful reference point here too. It covers minor roof repairs, not new equipment, so a battery installation sits on the same side of the line as the panels: it is a project the city expects to see rather than one you can simply carry out. If storage is part of the plan, describe it to the Service de l'aménagement et de la protection du territoire in the same conversation as the array, so that one complete application covers the whole project rather than two partial ones filed weeks apart.

On whether to add one at all, Quebec's rate structure narrows the case considerably. Tarif D is a two-tier block rate with no time-of-use periods, so there is no price gap between hours for a battery to arbitrage. Hydro-Québec's net metering bank already returns surplus at parity in kilowatt-hours, so exporting in summer and drawing the credit back in winter does the same job as storing the energy. What is left is backup: a battery with the right switching keeps chosen circuits running through an outage. That is a resilience purchase, and it should be judged on how often your address loses supply and what that costs you, not on a payback figure.

The one energy case that survives is a system that will generate more over a year than the household uses. There, self-consuming surplus beats leaving it in a bank that is cleared every 24 months. Sizing to your own consumption in the first place is the cheaper way to reach the same result.

Grants and financing available in Quebec

Hydro-Québec's LogisVert grant pays $1,000 per kW of installed capacity, capped at 40 percent of eligible project costs, which typically works out to $5,000 to $6,000 for a residential system. Eligible installations must be completed on or after June 30, 2025, and the application runs through the LogisVert portal within 9 months of the installation date. Ask, before signing, which party files the claim and what documentation the portal will require, because the grant is claimed after the work and the window does not reopen.

Federal support is limited. The Canada Greener Homes Loan, interest-free up to $40,000, stopped accepting new applications on October 2, 2025, and only previously approved loans continue to be funded. The Canada Greener Homes Affordability Program replaced it in September 2025 and delivers no-cost retrofits through provincial partners for low- to median-income households; solar PV is federally eligible, but each province sets its own technology list, so eligibility has to be checked rather than assumed. There is no Canadian federal investment tax credit for residential solar.

Incentives & rebates

Last verified:

Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Hydro-Québec option d'autoproduction

Hydro-Québec's option d'autoproduction is 1:1 net metering in kilowatt-hours: surplus kWh enter a banque de surplus and are deducted from later consumption at the customer's own tariff prices, and article 2.50 of the 2026 tariff keeps the bill from going negative. The bank is zeroed every 24 months, on 31 March of an even year, and article 2.51 credits any remaining balance to the account at the average cost of supply, 4.730 cents per kWh, rather than paying it out. Self-generation is capped at 1,000 kW. Residential Tarif D is a two-tier volumetric rate, not time-of-use: 7.065 cents per kWh on the first block (40 kWh times the days in the period) and 11.142 cents on the rest. Six municipalities run their own distributors (Sherbrooke, Saguenay's Jonquière borough, Alma, Magog, Baie-Comeau and Westmount) and are not on this arrangement, as is part of Saint-Hyacinthe, served by the Coopérative d'électricité de Saint-Jean-Baptiste.

Your utility

Hydro-Québec

net metering

1:1 kWh credit banked in a banque de surplus and deducted from later consumption; the bank is reset to zero every 24 months (31 March of each even year) and any positive balance is paid out at the average cost of supply of 4.730 cents per kWh

View Hydro-Québec solar policy details →

How payback works in Quebec

System cost
$23,953
Estimated net cost
$23,953
Estimated payback
~18.0 years
25-year net savings
~$9,315

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

Do solar panels need a permit in Granby?
Yes. Granby publishes a list of work that does not need a permit, covering minor roof repairs such as a chimney, fascia, soffit or a few shingles. Adding new equipment such as solar panels is not on that list, so the project goes through the standard permit or certificate process with the Service de l'aménagement et de la protection du territoire.
How long does a Granby permit take?
The city does not publish a number. It states that processing times vary by permit type and by time of year. The practical approach is to submit a complete application early, and to ask the Service de l'aménagement et de la protection du territoire what its turnaround currently looks like for the season you are applying in.
Are solar credits in Quebec paid in dollars?
No. Surplus is banked as a kilowatt-hour credit that offsets later consumption one for one. Only what is left in the bank at the reset, every 24 months on 31 March of an even year, converts to money, and it converts at a wholesale price well below the retail rate.

Ready to start?

Get matched with a vetted local installer in minutes.