ON · Solar

Solar quotes in Windsor, ON.

One real quote from a vetted local Windsor installer, sized to your roof, your bill, and every federal + provincial rebate you qualify for.

One vetted local installer · no lead list
What you get
  • One vetted local Windsor installer
  • Rebates checked for your exact address
  • No call-center spam, no lead list
7.5 kW
Average system size
$2.90/W
Average cost (CAD)
11 yrs
Average payback
124+
Local installers

Why solar in Windsor

Windsor has the strongest solar resource of any city in this set of Ontario pages, at about 1,211 kWh a year for each kW of panel capacity installed. That makes the local decisions worth getting right. ENWIN Utilities distributes electricity to the city's roughly 229,660 residents, and residential customers choose between Time-of-Use and Tiered pricing, which changes what a self-consumed kilowatt hour is worth to you. On the municipal side there is a distinction most cities do not draw so plainly: Windsor lists solar panels among the projects that need a building permit, while free-standing solar panels are listed separately as not needing one. This page covers the yield, the rate choice, the permit line, the roof and the money.

What we install on in Windsor

Windsor's housing stock, briefly.

Windsor's housing stock is majority single-detached (60.1%), with a comparatively low row house share (6.6%) and a combined apartment share (13% high-rise plus 11.4% low-rise) that reflects its older, lower-density urban form. Most Windsor homes have a full private roof available for solar.

Source: www150.statcan.gc.ca

  • Single-detached houses (about 60% of dwellings) generally offer a full roof for a solar installer to design around
  • High-rise apartments (about 13%) need landlord or condo corporation approval rather than an individual permit
  • Low-rise apartments under five storeys (about 11%) face the same building-ownership hurdle
  • Row houses are about 7% of dwellings

Source: www150.statcan.gc.ca

Your utility

How ENWIN Utilities treats solar.

ENWIN Utilities is Windsor's electricity distributor. Residential customers choose between Time-of-Use pricing, where the rate depends on the hour and season (for example, winter mid-peak weekdays bill at $0.157 per kWh), and Tiered pricing, where a first block of consumption each month bills at a lower rate of about $0.12 per kWh before a higher tier applies. That block is seasonal: 1,000 kWh in a winter month, but 600 kWh during the summer period of May 1 to October 31, so the same household crosses into the higher tier sooner in summer. Solar output peaks in exactly those months, which is part of why Tiered can suit a solar home.

Source: enwin.com

Permits in Windsor

Windsor's building permit guidance lists solar panels among projects that need a permit, while free-standing solar panels are listed separately as not needing one.

Source: citywindsor.ca

What a Windsor roof produces in a year

Windsor's solar potential is about 1,211 kWh a year for each kW of panel capacity installed, from Natural Resources Canada's municipal photovoltaic potential dataset. That figure assumes a well oriented and unshaded array, so it describes the best case for the city rather than a guarantee for your address, but it is a high figure by Ontario standards and it means a given system size does more work here than the same system would further north.

Use it to size, not to forecast a bill. Multiply the yield by a proposed system size and compare the result against twelve months of your own metered consumption. That is the comparison that says whether a quote is proportionate to your household, and it is a more reliable test than a panel count or a headline system size.

The year is uneven. Long summer days produce several times what a short December day does, and snow on the modules suppresses winter output for stretches. Ontario's net metering handles that with a credit that builds through the summer and is drawn down through the winter, which is why the annual view is the one to judge a design on.

Time-of-Use or Tiered: what your rate choice does to solar

ENWIN Utilities is Windsor's electricity distributor, and residential customers choose between two pricing structures. Under Time-of-Use, the rate depends on the hour and the season: as a published example, winter mid-peak weekdays bill at $0.157 per kWh. Under Tiered pricing, the first 1,000 kWh used in a winter month bills at a lower rate of about $0.12 per kWh before a higher tier applies.

That choice matters for solar because the value of a kilowatt hour your array produces and your household consumes on the spot is the value of the kilowatt hour you did not have to buy. On Time-of-Use, that value moves with the clock, so an array producing into an expensive period is worth more than the same array producing into a cheap one. On Tiered, it depends instead on where in the month's consumption you sit: reducing usage that would have fallen into the higher tier is worth more than reducing usage in the first block.

The practical instruction is simple. Find out which structure you are on before you evaluate a quote, and ask that the numbers in it be built on your actual rate rather than a generic assumption. A proposal that does not name your rate structure has not been built for your house.

The same logic drives the battery question. Storage moves a kilowatt hour from when it was generated to when you need it, which is worth more on a rate that varies by hour than on a flat one. Whether it pays depends on your household's pattern of use, so it is a calculation to run rather than a product to assume.

Net metering in Windsor, and what exports earn

Ontario's net metering runs through your local distribution company, which in Windsor is ENWIN. Exported solar is credited kilowatt hour for kilowatt hour at the retail electricity rate against future bills. Credits carry forward for up to 12 months, and there is no cash payment for net annual excess generation.

The design consequence is the same across the province and worth stating plainly: capacity beyond what your household uses over a year generates credits that expire rather than money that arrives. Your own annual consumption, not the size of your roof, is the ceiling worth building to.

One provincial threshold is recent and works in your favour. As of May 1, 2026 the Ontario Energy Board raised the simplified micro-embedded generation threshold from 10 kW to 12 kW, so a larger share of residential systems now qualifies for the streamlined connection process. If a proposed design sits just above that line, ask what the extra capacity is buying you against the heavier review it triggers.

Because the details of applications, metering and connection costs are set by each distributor, ask ENWIN directly what its connection process requires and what it charges, and ask your installer to show you that answer in writing rather than describing it from memory.

The permit line between rooftop and free-standing panels

Windsor's building permit guidance lists solar panels among the projects that need a permit, while free-standing solar panels are listed separately as not needing one. That is a distinction few municipalities state so directly, and it can change the shape of a project.

It matters most where a roof is poorly oriented, shaded or too small to carry a useful array. If a ground-based option is on the table for your property, the permit position is different from a rooftop installation, so it is worth asking the city to confirm how your specific proposal is classified before you assume either outcome. Site constraints, setbacks and what your lot can accommodate are separate questions from the permit itself.

For the common case, a roof-mounted array, plan on the permit as a required step and ask your installer whether the fee sits inside the quoted price or is billed on top. Then treat the municipal approval and the utility connection as two parallel tracks, because clearing one does nothing to advance the other.

Windsor's housing stock and what it means for your roof

Windsor's housing stock is majority single-detached at 60.1% of dwellings, reflecting the city's older and lower-density urban form. For six homes in ten that means a private roof under the owner's control, usually with a choice of planes, and no shared roofline to negotiate.

Apartments account for a meaningful share: 13% high-rise and 11.4% low-rise. In both cases the rooftop decision belongs to a building owner or condominium corporation rather than to a resident, so the productive first step for anyone in one of those buildings is asking whether roof access is even on the table.

Row houses are a comparatively small share here at 6.6%, notably smaller than in the fast-growing suburbs elsewhere in southern Ontario. That means the narrow-roof problem, where the usable south-facing section rather than your consumption sets the system size, applies to fewer Windsor homes than it does in many other cities.

In an older housing stock, roof condition deserves early attention. Panels are warranted for decades, so if the covering is near the end of its life, replacing it before the array goes up avoids paying a second time for removal and reinstallation later.

Rebates and financing available to a Windsor homeowner

Ontario's Home Renovation Savings Program is the live provincial offer, with combined rebates of up to $10,000 for solar PV paired with battery storage. It launched in January 2025 and was expanded for the 2026-27 programme year, running April 1, 2026 to March 31, 2027. The figure covers solar and storage together, so a solar-only project is a different calculation.

One condition should be settled before you apply. Homeowners taking the programme's solar incentive are generally directed to a load-displacement configuration rather than full net metering, which is a different way of connecting the same equipment and treats exported power differently. Confirm the current rules with your installer, and with ENWIN, so the rebate you are counting on and the connection you are applying for describe the same project.

Federal financing has narrowed. The Canada Greener Homes Loan, interest free up to $40,000, stopped accepting new applications on October 2, 2025 and only previously approved loans are still being funded. Its replacement, the Canada Greener Homes Affordability Program, launched in September 2025 and delivers no-cost retrofits through participating provinces, which do not currently include Ontario, for low to median income households, with solar PV federally eligible though each province sets its own technology list. Canada has no federal investment tax credit for residential solar, so no such credit belongs in your budget.

Finally, some Ontario municipalities and local utilities periodically offer financing such as local improvement charges or on-bill financing. These are local and they change, so ask what is currently available in your service area at the point you are ready to proceed.

Incentives & rebates

Last verified:

Provincial

Home Renovation Savings Program (Battery Storage)

Up to $5,000

Battery storage incentive under the same Save on Energy program, stackable with the solar incentive on a paired system.

View official source → Updated
Provincial

Home Renovation Savings Program (Solar)

Up to $5,000

Ontario's flagship residential energy program, delivered through Save on Energy. Homeowners taking the solar incentive are generally directed to a load-displacement configuration rather than full net metering; confirm the current rules with your installer before applying.

View official source → Updated
Federal Closed

Canada Greener Homes Loan

$40,000 financing available

Interest-free federal financing for home energy retrofits. Closed to new applicants; only previously approved loans are still being funded.

View official source → Updated

Net metering: Net metering at retail rate

Ontario offers net metering through local distribution utilities: exported solar is credited kWh-for-kWh at the retail electricity rate against future bills, with credits carried forward up to 12 months and no cash payment for annual net excess. Time-of-use pricing makes self-consumption and storage more valuable.

Your utility

ENWIN Utilities

net metering
View ENWIN Utilities solar policy details →

How payback works in Ontario

System cost
$24,866
Estimated net cost
$24,866
Estimated payback
~11.0 years
25-year net savings
~$31,648

These figures are illustrative; your actual quote reflects your roof, sun exposure, and local utility rates.

Frequently asked questions

How much solar energy does a Windsor roof produce?
About 1,211 kWh a year for each kW of panel capacity, for a well oriented, unshaded array. That is a high figure by Ontario standards, though orientation, shading and winter snow cover all reduce what a specific roof achieves.
Do I need a building permit for solar panels in Windsor?
Windsor's building permit guidance lists solar panels among projects that need a permit, while free-standing solar panels are listed separately as not needing one. Ask the city to confirm how your specific proposal is classified before assuming either outcome.
Should I be on Time-of-Use or Tiered pricing with ENWIN?
It depends on when and how much you use. Under Time-of-Use the rate varies by hour and season, with winter mid-peak weekdays billing at $0.157 per kWh. Under Tiered, the first 1,000 kWh in a winter month bills at about $0.12 per kWh before a higher tier applies. Ask that any solar quote be built on your actual rate.
What happens to solar credits I do not use?
Ontario credits exports kilowatt hour for kilowatt hour at the retail rate through your distributor, and credits carry forward for up to 12 months with no cash payment for net annual excess. Sizing to your own annual consumption is what keeps generation from expiring unused.
What size system qualifies for the simplified connection process?
Up to 12 kW. The Ontario Energy Board raised the simplified micro-embedded generation threshold from 10 kW to 12 kW as of May 1, 2026, so more residential systems now qualify for the streamlined path.

Ready to start?

Get matched with a vetted local installer in minutes.